Combustion Turbine Generator Construction
Owner: Mississippi Power
Location: Kemper County, Mississippi
Scope: Construction - Direct Hire
Contract: Lump Sum
Start Date: September, 2012
Completion Date: March, 2013
Description: Our scope at the Kemper County IGCC Project consists of the installation two (2) Siemens Gas Turbine / Generators. The Siemens Combustion Turbines consists of two (2) 235MW Gas Turbine and Generator, Inlet Filter House, Lube Oil Package, Electrical Package, Fire Protection System, Exhaust Transition and all auxiliary systems and equipment supplied by Siemens. These systems include approximately 7,000 LF of pipe, 420 instruments, and 250,000 LF of cable. The scope will go from the initial setting of equipment through turnover to the Client for Start-up activities.



